TEKTRON
Home Up Sensors Connectivity Bus Systems Signal Lights Wireless Control Machine Safety Ex-equipment About Us

Contact Us          Quality          Applications          Control Panels          Calibration Service                         email:  sales@tektron.ie               Tel: +353 (0)21 4313331
 

 

Up
FF Cable
FF I/O Stations
FF IP67 J/Bs
FF IP20 J/Bs
FF 7/8"Cordsets
FF M12 cordsets
FF 7/8"Connectors
FF M12 Connectors
FF Bus Tees
FF Wireable Tees
FF Term Resist
FF Surge Suppressors
FF Gender Changers
FF PS Conditioner
Entry Closures

 

 

 

 

 

Foundation Fieldbus M12 Cordsets  
 

Use the following chart to specify the plug and/or socket arrangement required on each end of a desired cable length.
Once you have selected the cable type you require and the cable length in metres, the chart enables you to select which pre-moulded connector you require on one end.
You can then select either to have the other end of the cable without a connector (column 2 in the chart) or select the type of connector you require on the other end from the corresponding row beneath.

Note: Where "*" appears insert the length required in metres.