![Up](_derived/up_cmp_spring-by-f010_vbtn.gif)
![FF Cable](_derived/ff_cable.htm_cmp_spring-by-f010_vbtn.gif)
![FF I/O Stations](_derived/ff_i_o_stations.htm_cmp_spring-by-f010_vbtn.gif)
![FF IP67 J/Bs](_derived/j_boxes_ip67.htm_cmp_spring-by-f010_vbtn.gif)
![FF IP20 J/Bs](_derived/term_resistors.htm_cmp_spring-by-f010_vbtn.gif)
![FF 7/8"Cordsets](_derived/7_8ff_cordsets.htm_cmp_spring-by-f010_vbtn.gif)
![FF M12 cordsets](_derived/ff_m12_cordsets.htm_cmp_spring-by-f010_vbtn_p.gif)
![FF 7/8"Connectors](_derived/ff_connectors.htm_cmp_spring-by-f010_vbtn.gif)
![FF M12 Connectors](_derived/m12_connectors.htm_cmp_spring-by-f010_vbtn.gif)
![FF Bus Tees](_derived/ff_bus_tees.htm_cmp_spring-by-f010_vbtn.gif)
![FF Wireable Tees](_derived/ff_wireable_tees.htm_cmp_spring-by-f010_vbtn.gif)
![FF Term Resist](_derived/new_page_3.htm_cmp_spring-by-f010_vbtn.gif)
![FF Surge Suppressors](_derived/ff_surge_suppressors.htm_cmp_spring-by-f010_vbtn.gif)
![FF Gender Changers](_derived/ff_gender_changers.htm_cmp_spring-by-f010_vbtn.gif)
![FF PS Conditioner](_derived/ff_ps_conditioner.htm_cmp_spring-by-f010_vbtn.gif)
![Entry Closures](_derived/new_page_9.htm_cmp_spring-by-f010_vbtn.gif)
| |
Foundation Fieldbus M12 Cordsets
![](fiehorizsidebysidevertical.jpg)
|
Use the following chart to
specify the plug and/or socket arrangement required on each end of a desired
cable length.
Once you have selected the cable type you require and the cable length in
metres, the chart enables you to select which pre-moulded connector you require
on one end.
You can then select either to have the other end of the cable without a
connector (column 2 in the chart) or select the type of connector you require on
the other end from the corresponding row beneath. |
Note: Where "*" appears insert
the length required in metres.
|
![](ff_m1236.gif)
|
![](ff_m1237.gif)
|
|